{
    "id": 84898,
    "date": "2026-08-09T11:30:47",
    "date_gmt": "2026-08-09T15:30:47",
    "guid": {
        "rendered": "https:\/\/dbabim.dba-qc.com\/?p=84898"
    },
    "modified": "2026-07-25T21:33:03",
    "modified_gmt": "2026-07-26T01:33:03",
    "slug": "bim-level-1-2-3-differences",
    "status": "publish",
    "type": "post",
    "link": "https:\/\/dbabim.dba-qc.com\/en\/bim-level-1-2-3-differences\/",
    "title": {
        "rendered": "BIM Level 1, 2, and 3 Explained: What Is the Difference?"
    },
    "content": {
        "rendered": "<p><span style=\"font-weight: 400;\">Building Information Modeling has evolved from basic digital drafting into a structured framework for managing construction information across the entire project lifecycle. As BIM adoption has matured, different \u201clevels\u201d have been defined to describe the degree of collaboration, data integration, and workflow standardization within a project environment. BIM Level 1, Level 2, and Level 3 are commonly used terms to explain this progression.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Understanding the difference between these levels is essential for organizations implementing 3D BIM modelling, coordination processes, and digital construction workflows. Each level represents a shift not only in technology use, but in how information is produced, shared, validated, and governed across disciplines. Clear knowledge of these distinctions supports better BIM implementation, stronger long-term information management, and more predictable project outcomes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As projects increase in complexity, the ability to clearly define digital maturity becomes critical. Misunderstanding BIM levels can lead to unrealistic expectations, coordination gaps, or inefficient workflows. A structured explanation of these levels helps teams align technical processes with strategic objectives.<\/span><\/p>\n<h2><b>Key Points Summary<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM Level 1 introduces structured 3D modelling with limited collaboration.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM Level 2 enables coordinated discipline models within a managed data environment.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM Level 3 represents a fully integrated and collaborative digital workflow.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The main difference between levels lies in data sharing, coordination depth, and governance.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Higher BIM levels support more reliable clash detection and structured coordination.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Advancing between levels requires clear standards and defined information requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM levels impact lifecycle data continuity and facility management readiness.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structured BIM implementation ensures alignment with project objectives.<\/span><\/li>\n<\/ul>\n<h2><b>Understanding BIM Levels in Context<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM levels describe how digitally integrated a project workflow is. They do not simply refer to model complexity or visual detail. Instead, they indicate how information is structured, shared, validated, and coordinated across project stakeholders.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In early digital environments, models may exist but function primarily as drawing production tools. As digital maturity increases, models become coordination platforms. At the highest levels, they become central information repositories supporting lifecycle management.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is important to understand that BIM levels represent organizational and procedural maturity as much as technical capability. A project may use advanced modelling software yet still operate at a lower BIM level if coordination and governance structures are not clearly defined.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At lower levels, digital models may exist but remain largely isolated between disciplines. At higher levels, collaboration becomes systematic, with clearly defined standards governing data exchange, model coordination, approval processes, and lifecycle information delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For organizations implementing BIM, understanding these levels helps clarify where their workflows currently stand and what steps are required to achieve greater integration and long-term data reliability.<\/span><\/p>\n<h2><b>BIM Level 1 &#8211; Basic Digital Collaboration<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM Level 1 represents an early stage of digital adoption. At this level, 3D BIM modelling is introduced, but workflows still rely heavily on traditional documentation practices.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Level 1 is often the transition point between fully 2D drafting environments and structured digital modelling. While digital tools are being used, coordination methods may still reflect conventional practices.<\/span><\/p>\n<h3><b>Key Characteristics of BIM Level 1<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">At Level 1, projects typically involve:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">3D models developed by individual disciplines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">2D documentation generated from digital models.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A shared file storage system, often called a common data environment.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Limited real-time collaboration between disciplines.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Although digital models are used, they are not fully integrated. Each discipline often works independently, exchanging drawings rather than coordinated models. Model sharing may occur, but structured clash detection and integrated coordination processes are not consistently applied.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Level 1 is important because it establishes foundational digital processes. Teams begin standardizing file naming, documentation protocols, layer structures, and model organization. These early standards provide the groundwork for more advanced coordination practices later.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, risks remain at this level. Because collaboration is limited, inconsistencies between discipline models may not be detected until later project stages. While Level 1 improves documentation efficiency, it does not yet unlock the full coordination benefits of BIM.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This stage supports early digital workflows but does not yet provide full interdisciplinary integration.<\/span><\/p>\n<h2><b>BIM Level 2 &#8211; Coordinated and Managed Collaboration<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM Level 2 represents a significant shift toward structured coordination. At this level, each discipline develops its own 3D model, but models are shared and coordinated within a managed digital environment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The key advancement from Level 1 to Level 2 lies in governance and process definition. Collaboration is no longer informal. It becomes structured, scheduled, and measurable.<\/span><\/p>\n<h3><b>Core Elements of BIM Level 2<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Level 2 workflows typically include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Discipline-specific 3D models for architecture, structure, and building systems.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Formalized information exchange procedures.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Regular model coordination reviews.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structured clash detection processes.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defined roles for BIM management and coordination.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Instead of relying solely on drawings, teams exchange models at defined intervals. These models are combined into a federated model, meaning multiple discipline models are viewed together for coordination purposes while remaining separately authored.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Clash detection becomes a central coordination activity at this stage. Conflicts between systems, such as mechanical ductwork intersecting structural beams, can be identified and resolved before construction begins. This reduces rework, site conflicts, and schedule disruptions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Level 2 also requires clearer governance. BIM implementation plans define modelling standards, information requirements, naming conventions, and delivery milestones. A managed common data environment ensures that teams work from the latest validated information.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This structured environment improves predictability and accountability. Coordination becomes proactive rather than reactive.<\/span><\/p>\n<h3><b>How Level 2 Improves Project Outcomes<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The transition from Level 1 to Level 2 strengthens digital construction workflows by:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reducing coordination errors between disciplines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increasing confidence in model-based decision-making.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting structured quantity extraction and planning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Improving communication across project teams.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clarifying responsibility for model accuracy and data updates.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Level 2 is widely adopted because it balances technical integration with practical implementation. It introduces measurable improvements in coordination while remaining achievable for many organizations.<\/span><\/p>\n<h2><b>BIM Level 3 &#8211; Fully Integrated and Collaborative BIM<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM Level 3 represents the most advanced form of digital collaboration. At this level, teams work within a highly integrated environment where data is shared in real time and model ownership becomes more collaborative.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The progression to Level 3 reflects a shift from federated coordination to integrated digital ecosystems.<\/span><\/p>\n<h3><b>Defining Characteristics of BIM Level 3<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Level 3 workflows typically involve:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A unified or highly integrated shared model environment.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Continuous data synchronization between disciplines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Advanced lifecycle information integration.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Strong alignment between design, construction, and operations data.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Increased transparency across all stakeholders.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Unlike Level 2, where models are federated but remain discipline-specific, Level 3 promotes deeper interoperability. Information flows more seamlessly across stakeholders, and updates are reflected consistently across the project environment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This level supports long-term asset information management and enhances the transition from construction to facility operations. The model becomes a central information platform rather than a coordination tool used at scheduled intervals.<\/span><\/p>\n<h3><b>Implications for Lifecycle Management<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Level 3 integration strengthens lifecycle continuity by:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintaining consistent data structures from design through operations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting asset tracking and maintenance planning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reducing information loss during project handover.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enhancing digital records for renovations or future upgrades.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">For organizations managing complex or long-term assets, Level 3 integration enhances digital resilience and operational clarity. Information generated during design and construction remains structured and usable well beyond project completion.<\/span><\/p>\n<h2><b>Comparison of BIM Level 1, 2, and 3<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The differences between BIM levels can be summarized across several key attributes.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Attribute<\/b><\/td>\n<td><b>BIM Level 1<\/b><\/td>\n<td><b>BIM Level 2<\/b><\/td>\n<td><b>BIM Level 3<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Collaboration<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Limited, discipline-based<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Coordinated through federated models<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Fully integrated and collaborative<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Data Exchange<\/span><\/td>\n<td><span style=\"font-weight: 400;\">File-based sharing<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Managed data environment<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Integrated data framework<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Coordination<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Primarily document-based<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Model-based clash detection<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Continuous coordinated workflow<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Lifecycle Integration<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Limited<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Structured handover planning<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Strong lifecycle data continuity<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">This comparison illustrates how collaboration, governance, and information reliability increase with each level. The progression is not only technological but organizational.<\/span><\/p>\n<h2><b>Transitioning Between BIM Levels<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Moving from one BIM level to another requires structured planning. It is not simply a software upgrade. It involves redefining workflows, responsibilities, information standards, and coordination protocols.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Organizations transitioning between levels should consider:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing current digital maturity and coordination practices.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defining clear BIM implementation objectives.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establishing coordination protocols and model standards.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Assigning defined BIM management and coordination roles.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Aligning information requirements with lifecycle goals.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Conducting regular audits to ensure compliance with defined standards.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Progression requires organizational commitment to digital construction workflows and disciplined coordination practices. Without defined oversight, transitions may stall or create inconsistencies between teams.<\/span><\/p>\n<h2><b>The Role of BIM Management and Coordination<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Advancing through BIM levels requires oversight and technical validation. At Level 2 and Level 3 in particular, clearly defined BIM management structures become essential.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Effective BIM management supports:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Standardized modelling practices.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reliable clash detection procedures.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear information delivery milestones.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Alignment between digital models and construction realities.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structured documentation of decisions and revisions.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Coordination teams play a central role in maintaining model integrity as complexity increases. As digital maturity grows, the importance of defined responsibilities becomes even more critical.<\/span><\/p>\n<h2><b>BIM Levels and Digital Construction Workflows<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM levels influence how digital workflows operate across project phases.<\/span><\/p>\n<p><b>At Level 1,<\/b><span style=\"font-weight: 400;\"> digital models primarily support design documentation and visualization.<\/span><\/p>\n<p><b>At Level 2<\/b><span style=\"font-weight: 400;\">, coordinated models support clash detection, construction planning, sequencing validation, and structured data exchange.<\/span><\/p>\n<p><b>At Level 3<\/b><span style=\"font-weight: 400;\">, integrated workflows extend further into lifecycle management, strengthening facility management BIM support and long-term asset clarity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The higher the BIM level, the more central the model becomes to decision-making. Instead of acting as a drawing replacement, the model becomes a coordinated information backbone that supports planning, coordination, validation, and operations.<\/span><\/p>\n<h2><b>Selecting the Appropriate BIM Level<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Not every project requires full Level 3 integration. The appropriate level depends on:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project complexity.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Number of disciplines involved.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Lifecycle data requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Client information expectations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Organizational digital maturity.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Clear assessment of these factors helps determine the most effective level of implementation. Structured BIM implementation ensures that the chosen level aligns with project scope and organizational capacity rather than ambition alone.<\/span><\/p>\n<h2><b>Supporting Structured BIM Level Implementation<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Successfully operating at Level 2 or Level 3 requires defined processes for 3D BIM modelling, coordination, and information governance. Clear modelling standards, regular coordination reviews, documented information exchanges, and structured validation checkpoints are essential to maintaining reliability.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">DBABIM supports clients in implementing structured BIM management frameworks that align modelling practices with coordination objectives and digital construction workflows. By defining clear expectations for collaboration, data exchange, and lifecycle continuity, projects maintain consistency as digital maturity increases.<\/span><\/p>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM Level 1, Level 2, and Level 3 represent stages in the evolution of digital construction workflows. Level 1 introduces structured digital modelling with limited collaboration. Level 2 strengthens coordination through managed model exchanges and structured clash detection. Level 3 advances toward fully integrated and collaborative data environments that support lifecycle continuity.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Understanding these differences allows project teams to implement BIM more effectively and align digital processes with project objectives. With clearly defined standards, disciplined coordination, and structured governance, organizations can progress confidently between levels and strengthen long-term information reliability.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For projects seeking structured guidance in advancing BIM maturity, DBABIM provides expertise in 3D BIM modelling, coordination, and BIM implementation to support consistent and reliable digital workflows.<\/span><\/p>",
        "protected": false
    },
    "excerpt": {
        "rendered": "<p>BIM Level 1, 2 and 3 describe increasing stages of digital collaboration, from basic 3D modelling with limited data sharing (Level 1) to coordinated federated models with structured clash detection (Level 2) and fully integrated, real-time collaborative environments supporting lifecycle management (Level 3). This guide compares each level&#8217;s collaboration, data exchange and coordination practices, helping teams choose the right BIM maturity for their project.<\/p>",
        "protected": false
    },
    "author": 4,
    "featured_media": 84899,
    "comment_status": "closed",
    "ping_status": "closed",
    "sticky": false,
    "template": "",
    "format": "standard",
    "meta": {
        "_acf_changed": false,
        "_seopress_titles_title": "BIM Level 1, 2, and 3 Explained: Key Differences",
        "_seopress_titles_desc": "BIM Level 1, 2 and 3 explained: understand collaboration, data exchange and coordination differences across each stage of BIM maturity.",
        "_seopress_robots_index": "",
        "_seopress_robots_follow": "",
        "_seopress_robots_imageindex": "",
        "_seopress_robots_snippet": "",
        "_seopress_robots_primary_cat": "",
        "_seopress_robots_breadcrumbs": "",
        "_seopress_robots_freeze_modified_date": "",
        "_seopress_robots_custom_modified_date": "",
        "_seopress_robots_canonical": "",
        "_seopress_social_fb_title": "",
        "_seopress_social_fb_desc": "",
        "_seopress_social_fb_img": "",
        "_seopress_social_fb_img_attachment_id": 0,
        "_seopress_social_fb_img_width": 0,
        "_seopress_social_fb_img_height": 0,
        "_seopress_social_twitter_title": "",
        "_seopress_social_twitter_desc": "",
        "_seopress_social_twitter_img": "",
        "_seopress_social_twitter_img_attachment_id": 0,
        "_seopress_social_twitter_img_width": 0,
        "_seopress_social_twitter_img_height": 0,
        "_seopress_redirections_value": "",
        "_seopress_redirections_enabled": "",
        "_seopress_redirections_enabled_regex": "",
        "_seopress_redirections_logged_status": "",
        "_seopress_redirections_param": "",
        "_seopress_redirections_type": 0,
        "_seopress_analysis_target_kw": "",
        "_seopress_news_disabled": "",
        "_seopress_video_disabled": "",
        "_seopress_video": [],
        "_seopress_pro_schemas_manual": [
            {
                "_seopress_pro_rich_snippets_article_type": "Article",
                "_seopress_pro_rich_snippets_article_title": "BIM Level 1, 2, and 3 Explained: What Is the Difference?",
                "_seopress_pro_rich_snippets_article_desc": "BIM Level 1, 2 and 3 explained: understand collaboration, data exchange and coordination differences across each stage of BIM maturity.",
                "_seopress_pro_rich_snippets_article_author": "Marie Dub\u00e9",
                "_seopress_pro_rich_snippets_article_img": "https:\/\/dbabim.dba-qc.com\/wp-content\/uploads\/2026\/07\/shutterstock_1195887817-scaled.jpg",
                "_seopress_pro_rich_snippets_article_coverage_start_date": "",
                "_seopress_pro_rich_snippets_article_coverage_start_time": "",
                "_seopress_pro_rich_snippets_article_coverage_end_date": "",
                "_seopress_pro_rich_snippets_article_coverage_end_time": "",
                "_seopress_pro_rich_snippets_article_speakable_css_selector": "",
                "_seopress_pro_rich_snippets_type": "articles",
                "_seopress_pro_rich_snippets_article_img_attachment_id": "84899",
                "_seopress_pro_rich_snippets_article_img_width": "2560",
                "_seopress_pro_rich_snippets_article_img_height": "1601"
            }
        ],
        "_seopress_pro_rich_snippets_disable_all": "",
        "_seopress_pro_rich_snippets_disable": [],
        "_seopress_pro_schemas": [],
        "footnotes": ""
    },
    "categories": [
        19
    ],
    "tags": [],
    "class_list": [
        "post-84898",
        "post",
        "type-post",
        "status-publish",
        "format-standard",
        "has-post-thumbnail",
        "hentry",
        "category-bim-guide"
    ],
    "acf": [],
    "_links": {
        "self": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84898",
                "targetHints": {
                    "allow": [
                        "GET"
                    ]
                }
            }
        ],
        "collection": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts"
            }
        ],
        "about": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/types\/post"
            }
        ],
        "author": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/users\/4"
            }
        ],
        "replies": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/comments?post=84898"
            }
        ],
        "version-history": [
            {
                "count": 1,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84898\/revisions"
            }
        ],
        "predecessor-version": [
            {
                "id": 84900,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84898\/revisions\/84900"
            }
        ],
        "wp:featuredmedia": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media\/84899"
            }
        ],
        "wp:attachment": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media?parent=84898"
            }
        ],
        "wp:term": [
            {
                "taxonomy": "category",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/categories?post=84898"
            },
            {
                "taxonomy": "post_tag",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/tags?post=84898"
            }
        ],
        "curies": [
            {
                "name": "wp",
                "href": "https:\/\/api.w.org\/{rel}",
                "templated": true
            }
        ]
    }
}