{
    "id": 84895,
    "date": "2026-07-29T13:15:04",
    "date_gmt": "2026-07-29T17:15:04",
    "guid": {
        "rendered": "https:\/\/dbabim.dba-qc.com\/?p=84895"
    },
    "modified": "2026-07-25T21:28:15",
    "modified_gmt": "2026-07-26T01:28:15",
    "slug": "bim-execution-plan-bep-guide",
    "status": "publish",
    "type": "post",
    "link": "https:\/\/dbabim.dba-qc.com\/en\/bim-execution-plan-bep-guide\/",
    "title": {
        "rendered": "What Is a BIM Execution Plan? Comprehensive Guide to BIM Execution Plan Essentials"
    },
    "content": {
        "rendered": "<p><span style=\"font-weight: 400;\">A BIM Execution Plan, commonly referred to as a BEP, is a foundational document that defines how Building Information Modeling will be applied, managed, and governed throughout a project. It establishes a shared framework for collaboration, data management, and coordination across all disciplines involved in the delivery of a built asset. As projects become more complex and information-intensive, the BIM Execution Plan plays a critical role in aligning stakeholders and ensuring that digital workflows support project objectives rather than introduce uncertainty.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Understanding what a BIM Execution Plan contains and how it functions helps project teams reduce risk, improve coordination, and maintain consistent information quality from early planning through construction and into operations.<\/span><\/p>\n<h2><b>Key Points Summary<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A BIM Execution Plan defines how BIM will be implemented and managed across the project lifecycle<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear roles and responsibilities improve coordination and accountability<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Standardized workflows ensure consistent modeling and information exchange<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defined BIM uses align digital outputs with project objectives<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Integrated data management supports construction and long-term operations<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reality capture improves model accuracy and progress validation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structured review and validation reduce risk and rework<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A well-maintained BEP supports smoother handover and facility management<\/span><\/li>\n<\/ul>\n<h2><b>What Is a BIM Execution Plan?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A BIM Execution Plan is a structured document that outlines how project teams will create, manage, exchange, and use BIM information. It translates high-level project goals into practical workflows that guide daily modeling and coordination activities. Rather than focusing only on technical standards, the BEP defines processes, responsibilities, and information requirements that apply throughout the project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The BEP is typically developed during early project stages and refined as the project evolves. When properly implemented, it becomes a reference point for all stakeholders, supporting clarity and consistency across disciplines.<\/span><\/p>\n<h2><b>Why the BIM Execution Plan Is Critical to Project Success<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Without a defined execution plan, BIM activities can become fragmented. Teams may use different assumptions, inconsistent standards, or incompatible workflows. This lack of structure increases the risk of miscommunication, rework, and data loss.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A well-defined BIM Execution Plan helps prevent these issues by:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Aligning expectations across stakeholders<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defining how information is created and validated<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establishing clear coordination protocols<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting traceable decision-making<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">By providing a shared framework, the BEP supports predictable project delivery.<\/span><\/p>\n<h2><b>Key Objectives of a BIM Execution Plan<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The primary objective of a BIM Execution Plan is to ensure that BIM supports project goals rather than becoming an isolated technical exercise. To achieve this, the BEP typically focuses on several core objectives.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These objectives include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defining BIM uses that support design, coordination, and construction<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establishing data standards that ensure consistency<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clarifying roles and approval responsibilities<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting information continuity across project phases<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">When objectives are clearly defined, BIM efforts remain focused and measurable.<\/span><\/p>\n<h2><b>Roles and Responsibilities Within the BEP<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Clear assignment of roles and responsibilities is one of the most important elements of a BIM Execution Plan. Projects often involve multiple organizations and disciplines, making clarity essential.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The BEP typically defines responsibilities for:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM management and coordination<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Model authoring and updates<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Information validation and approval<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Coordination issue resolution<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">By documenting who is responsible for what, the BEP reduces overlap, avoids gaps, and supports accountability.<\/span><\/p>\n<h2><b>Defining BIM Uses and Project Requirements<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM can support many activities, but not all uses are required on every project. The BEP helps define which BIM uses are relevant and how they will be applied.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Common BIM uses may include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Design coordination<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clash detection<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Construction sequencing support<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">As-built documentation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Facility management data preparation<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Each defined use should be linked to clear information requirements and deliverables.<\/span><\/p>\n<h2><b>Information Requirements and Data Structure<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Information requirements define what data is needed, when it is needed, and how it should be structured. These requirements ensure that models contain the right level of information at each project stage.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A BIM Execution Plan typically addresses:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Level of information expectations by phase<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Naming conventions and data fields<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Model structure and organization<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">File exchange and storage protocols<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Clear data structure supports interoperability and long-term usability.<\/span><\/p>\n<h2><b>Coordination Workflows and Review Processes<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Coordination is a central function of BIM, and the BEP defines how coordination will occur. This includes how often models are shared, reviewed, and validated.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Effective coordination workflows often include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Regular model exchange cycles<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Federated model reviews<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Defined clash detection processes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Issue tracking and resolution procedures<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">By formalizing these steps, the BEP ensures coordination remains consistent and proactive.<\/span><\/p>\n<h2><b>Quality Control and Validation Procedures<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Quality control ensures that models and data meet defined standards before being used downstream. The BIM Execution Plan defines how quality is assessed and who is responsible for validation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Quality control procedures may include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Model audits against standards<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Data completeness checks<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Review of coordination outcomes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Approval gates at key milestones<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Embedding quality control into workflows reduces the likelihood of errors reaching construction.<\/span><\/p>\n<h2><b>Managing Change Through the BIM Execution Plan<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Change is inevitable, especially on complex projects. The BEP provides a framework for managing changes in a controlled way.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Change management within the BEP typically covers:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How model updates are proposed<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How impacts are assessed<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Who approves changes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How revisions are documented<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This structure helps teams respond to change without losing coordination or data integrity.<\/span><\/p>\n<h2><b>Integrating Reality Capture and Site Data<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Reality capture technologies such as drone-based surveying, photogrammetry, and point clouds enhance BIM accuracy when integrated through the BEP. These tools provide reliable representations of existing conditions and construction progress.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Within the BEP, reality capture integration may define:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Data capture frequency<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Accepted formats and accuracy thresholds<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Model comparison workflows<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Validation and update procedures<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This integration helps align digital models with physical conditions.<\/span><\/p>\n<h2><b>Supporting Construction Through the BEP<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">During construction, the BIM Execution Plan continues to guide information use. Models developed during design become references for coordination, sequencing, and documentation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction-phase benefits include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduced reliance on outdated drawings<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear reference for approved changes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Better coordination between field and office teams<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">A well-maintained BEP ensures BIM remains relevant beyond design.<\/span><\/p>\n<h2><b>Preparing for Handover and Facility Management<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The BIM Execution Plan should anticipate handover requirements early. This ensures that information created during the project supports operations rather than requiring rework.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Handover-focused BEP elements may include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">As-built model requirements<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Asset and equipment data standards<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Documentation linking strategies<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Validation prior to handover<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">This preparation supports smoother transition to operations.<\/span><\/p>\n<h2><b>BIM Execution Plan as a Lifecycle Tool<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Although often associated with early project phases, the BEP supports the entire lifecycle. Information created according to the plan remains usable during maintenance, renovations, and future upgrades.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Lifecycle benefits include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Improved data reliability<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Easier access to asset information<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduced information loss over time<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Treating the BEP as a lifecycle tool increases long-term value.<\/span><\/p>\n<h2><b>Typical BIM Execution Plan Components<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>BEP Component<\/b><\/td>\n<td><b>Purpose<\/b><\/td>\n<td><b>Outcome<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">BIM uses definition<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Align BIM with goals<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Focused modeling<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Roles and responsibilities<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Clarify accountability<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Improved coordination<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Data standards<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Ensure consistency<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Reliable information<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Coordination workflows<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Manage integration<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Reduced conflicts<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Validation procedures<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Control quality<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Lower risk<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Handover requirements<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Support operations<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Lifecycle continuity<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">This structure illustrates how the BEP supports predictable delivery.<\/span><\/p>\n<h2><b>Best Practices for Developing a BIM Execution Plan<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">To be effective, a BIM Execution Plan should be:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Developed collaboratively<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Aligned with project objectives<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Updated as the project evolves<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clearly communicated to all participants<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">These practices help ensure the BEP remains practical and relevant.<\/span><\/p>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A BIM Execution Plan is a critical foundation for structured, reliable BIM implementation. By defining roles, workflows, information requirements, and coordination processes, the BEP helps project teams manage complexity and maintain alignment throughout the project lifecycle. When supported by validation, reality capture integration, and lifecycle planning, the execution plan becomes a powerful tool for reducing risk and improving outcomes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">DBABIM supports the development and implementation of structured BIM Execution Plans that align information management, coordination, and lifecycle requirements with real project needs. By adopting a disciplined BEP approach, project teams can improve collaboration, protect data integrity, and support consistent performance from planning through long-term operations.<\/span><\/p>",
        "protected": false
    },
    "excerpt": {
        "rendered": "<p>A BIM Execution Plan (BEP) defines how BIM will be implemented, managed and governed across a project, covering roles, BIM uses, data standards, coordination workflows and validation procedures. This guide explains its purpose and key components, from early planning through construction, reality capture integration and handover, showing how a well-structured BEP reduces risk and supports predictable project delivery.<\/p>",
        "protected": false
    },
    "author": 4,
    "featured_media": 84896,
    "comment_status": "closed",
    "ping_status": "closed",
    "sticky": false,
    "template": "",
    "format": "standard",
    "meta": {
        "_acf_changed": false,
        "_seopress_titles_title": "What Is a BIM Execution Plan? Guide to BEP Essentials",
        "_seopress_titles_desc": "A BIM Execution Plan defines roles, workflows and data standards for BIM. Learn its purpose, key components and how it supports project delivery.",
        "_seopress_robots_index": "",
        "_seopress_robots_follow": "",
        "_seopress_robots_imageindex": "",
        "_seopress_robots_snippet": "",
        "_seopress_robots_primary_cat": "",
        "_seopress_robots_breadcrumbs": "",
        "_seopress_robots_freeze_modified_date": "",
        "_seopress_robots_custom_modified_date": "",
        "_seopress_robots_canonical": "",
        "_seopress_social_fb_title": "",
        "_seopress_social_fb_desc": "",
        "_seopress_social_fb_img": "",
        "_seopress_social_fb_img_attachment_id": 0,
        "_seopress_social_fb_img_width": 0,
        "_seopress_social_fb_img_height": 0,
        "_seopress_social_twitter_title": "",
        "_seopress_social_twitter_desc": "",
        "_seopress_social_twitter_img": "",
        "_seopress_social_twitter_img_attachment_id": 0,
        "_seopress_social_twitter_img_width": 0,
        "_seopress_social_twitter_img_height": 0,
        "_seopress_redirections_value": "",
        "_seopress_redirections_enabled": "",
        "_seopress_redirections_enabled_regex": "",
        "_seopress_redirections_logged_status": "",
        "_seopress_redirections_param": "",
        "_seopress_redirections_type": 0,
        "_seopress_analysis_target_kw": "",
        "_seopress_news_disabled": "",
        "_seopress_video_disabled": "",
        "_seopress_video": [],
        "_seopress_pro_schemas_manual": [
            {
                "_seopress_pro_rich_snippets_article_type": "Article",
                "_seopress_pro_rich_snippets_article_title": "What Is a BIM Execution Plan? Comprehensive Guide to BIM Execution Plan Essentials",
                "_seopress_pro_rich_snippets_article_desc": "A BIM Execution Plan defines roles, workflows and data standards for BIM. Learn its purpose, key components and how it supports project delivery.",
                "_seopress_pro_rich_snippets_article_author": "Marie Dub\u00e9",
                "_seopress_pro_rich_snippets_article_img": "https:\/\/dbabim.dba-qc.com\/wp-content\/uploads\/2026\/07\/shutterstock_2342641199-scaled.jpg",
                "_seopress_pro_rich_snippets_article_coverage_start_date": "",
                "_seopress_pro_rich_snippets_article_coverage_start_time": "",
                "_seopress_pro_rich_snippets_article_coverage_end_date": "",
                "_seopress_pro_rich_snippets_article_coverage_end_time": "",
                "_seopress_pro_rich_snippets_article_speakable_css_selector": "",
                "_seopress_pro_rich_snippets_type": "articles",
                "_seopress_pro_rich_snippets_article_img_attachment_id": "84896",
                "_seopress_pro_rich_snippets_article_img_width": "2560",
                "_seopress_pro_rich_snippets_article_img_height": "1624"
            }
        ],
        "_seopress_pro_rich_snippets_disable_all": "",
        "_seopress_pro_rich_snippets_disable": [],
        "_seopress_pro_schemas": [],
        "footnotes": ""
    },
    "categories": [
        19
    ],
    "tags": [],
    "class_list": [
        "post-84895",
        "post",
        "type-post",
        "status-publish",
        "format-standard",
        "has-post-thumbnail",
        "hentry",
        "category-bim-guide"
    ],
    "acf": [],
    "_links": {
        "self": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84895",
                "targetHints": {
                    "allow": [
                        "GET"
                    ]
                }
            }
        ],
        "collection": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts"
            }
        ],
        "about": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/types\/post"
            }
        ],
        "author": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/users\/4"
            }
        ],
        "replies": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/comments?post=84895"
            }
        ],
        "version-history": [
            {
                "count": 1,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84895\/revisions"
            }
        ],
        "predecessor-version": [
            {
                "id": 84897,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/84895\/revisions\/84897"
            }
        ],
        "wp:featuredmedia": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media\/84896"
            }
        ],
        "wp:attachment": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media?parent=84895"
            }
        ],
        "wp:term": [
            {
                "taxonomy": "category",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/categories?post=84895"
            },
            {
                "taxonomy": "post_tag",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/tags?post=84895"
            }
        ],
        "curies": [
            {
                "name": "wp",
                "href": "https:\/\/api.w.org\/{rel}",
                "templated": true
            }
        ]
    }
}