{
    "id": 7383,
    "date": "2026-02-16T14:45:36",
    "date_gmt": "2026-02-16T19:45:36",
    "guid": {
        "rendered": "https:\/\/dbabim.dba-qc.com\/?p=7383"
    },
    "modified": "2026-02-24T17:30:47",
    "modified_gmt": "2026-02-24T22:30:47",
    "slug": "benefits-bim-modeling",
    "status": "publish",
    "type": "post",
    "link": "https:\/\/dbabim.dba-qc.com\/en\/benefits-bim-modeling\/",
    "title": {
        "rendered": "What Are the Benefits of BIM Modeling?"
    },
    "content": {
        "rendered": "<p><span style=\"font-weight: 400;\">Building Information Modeling has become an essential method for designing, coordinating, and managing construction projects across Canada. By centralizing information within a structured digital environment, BIM provides the clarity and precision needed to support projects from early concept to long-term operations. Understanding the benefits of BIM modeling helps organizations make informed decisions, reduce uncertainties, and optimize the value of their built assets. The technology is not simply a design tool. It is a coordinated process that enhances collaboration, improves technical accuracy, and supports predictability throughout the project lifecycle.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As construction workflows continue to evolve, the demand for structured data and reliable digital models has increased significantly. BIM responds to these needs by bringing together geometry, documentation, and performance requirements within a unified environment. The benefits extend far beyond aesthetics or visualization. They affect productivity, quality control, safety, sustainability, and long-term asset management. With the rising complexity of modern buildings, the precision that BIM provides is becoming essential rather than optional.<\/span><\/p>\n<h2><b>Key Points Summary<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM improves project coordination by centralizing information and reducing inconsistencies between disciplines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Visual 3D modeling enhances understanding of design intent and supports more accurate decision-making.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Early detection of design conflicts reduces rework and strengthens on-site efficiency.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structured data within BIM models supports accurate quantity takeoffs and planning activities.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Lifecycle information helps owners manage maintenance, operations, and future upgrades.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Open, collaborative BIM workflows improve communication between architecture, engineering, and construction teams.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">BIM enhances safety and sustainability through simulation and analysis tools.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reliable BIM processes contribute to predictability and long-term asset performance.<\/span><\/li>\n<\/ul>\n<h2><b>Understanding the Value of BIM in Modern Construction<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The benefits of BIM modeling are rooted in the way information is structured and shared. Traditionally, construction teams worked from multiple disconnected drawings, creating challenges when updates occurred or when design intent needed clarification. BIM resolves these limitations by creating a coordinated environment where disciplines interact with the same model, reducing miscommunication and uncertainty.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Beyond simply keeping drawings coordinated, BIM provides transparency in how decisions are made and how design changes affect downstream work. When teams operate without a structured digital workflow, they often rely on personal interpretation of drawings or written notes. BIM replaces these assumptions with model-based clarity, helping ensure that each decision is grounded in accurate, verified information.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Because the model evolves alongside the project, it becomes a long-term reference that tracks decisions and supports more reliable forecasting. Ultimately, this level of clarity supports stronger planning and contributes to better outcomes across design, construction, and operations.<\/span><\/p>\n<h2><b>Benefit 1: Improved Coordination and Communication<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">One of the strongest advantages of BIM modeling is its ability to improve coordination between project participants. Because architecture, structural systems, and building services are modeled within a shared digital environment, teams gain a clear understanding of how components interact.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As buildings grow more complex, the need for accurate interdisciplinary coordination becomes more critical. Mechanical, electrical, and structural systems often compete for space above ceilings, within shafts, or inside mechanical rooms. When these elements are designed separately, conflicts are common. BIM reduces these issues by visualizing the physical relationships between systems, helping teams collaborate with greater confidence.<\/span><\/p>\n<h3><b>How coordination improves project outcomes<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Coordination challenges are common in traditional workflows. Drawings may conflict, updates may be missed, and different disciplines may interpret information differently. BIM improves communication by giving teams access to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A shared model that reflects current design intent<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Consistent documentation generated directly from the model<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear visual representation of complex building elements<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Up-to-date information that reduces uncertainty during decision-making<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Because coordination occurs continuously throughout the design process, teams avoid the cycle of repeated corrections that traditionally slows projects down. Improved communication also reduces the number of clarifications required during construction, helping field teams proceed with greater confidence.<\/span><\/p>\n<h2><b>Benefit 2: Early Conflict Detection and Reduced Rework<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM supports early conflict detection by identifying design issues before they reach the construction phase. When models from architecture, structure, and mechanical systems are combined in a coordinated environment, potential clashes appear clearly.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Early conflict detection has become one of the core reasons why organizations adopt BIM. When issues are resolved digitally rather than in the field, construction becomes safer, more predictable, and significantly more efficient. Many challenges that traditionally emerged during installation are now anticipated and resolved weeks or months earlier.<\/span><\/p>\n<h3><b>Common issues detected through coordinated modeling<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Before construction begins, BIM can help detect:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mechanical components interfering with structural beams<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Electrical systems conflicting with architectural layouts<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Insufficient clearance for equipment access<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Inaccurate room dimensions affecting system placement<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Routing paths that cannot accommodate necessary slopes or angles<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Overlapping elements between multiple building systems<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Each issue detected virtually prevents disruptions during installation. Avoiding rework not only saves time but also reduces the stress placed on construction teams working under tight schedules. The model becomes a tool for risk mitigation, helping deliver a safer and more controlled building process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By resolving issues early, teams benefit from improved coordination and more predictable sequencing. This contributes to smoother workflows and stronger alignment across disciplines.<\/span><\/p>\n<h2><b>Benefit 3: Enhanced Visualization and Design Understanding<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Visual clarity is another core benefit of BIM modeling. Rather than interpreting complex technical drawings, stakeholders can view the model in three dimensions. This helps teams conceptualize spaces, verify alignment, and better understand design intent.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Visualization is especially valuable when projects involve non-technical decision-makers or require community engagement. Three-dimensional models allow individuals without technical training to understand how spaces will function and how building components relate to one another.<\/span><\/p>\n<h3><b>How visualization supports better decision-making<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">BIM\u2019s visual capabilities support key project activities, including:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing spatial layouts in detailed 3D views<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identifying potential user-experience challenges early<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting stakeholder presentations and approvals<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Simulating how spaces will be used once the facility is operational<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clarifying complex relationships between building systems<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Visual understanding helps teams respond to design challenges more effectively. Instead of relying on assumptions, decisions are grounded in clear and accessible representations of the work. This reduces confusion, accelerates approvals, and supports a more efficient design process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Visualization also contributes to more accurate construction planning. Field teams can reference the model to understand installation sequences, access paths, and potential spatial constraints.<\/span><\/p>\n<h2><b>Benefit 4: Structured Data for Quantity Takeoffs and Planning<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM models contain detailed information about building components. When modeled according to agreed standards, this data can be used to support quantity takeoffs, planning, and construction sequencing.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Structured data increases efficiency by eliminating the need for manual quantity extraction. Instead of measuring drawings or interpreting symbols, teams can rely on accurate digital information. This ensures consistency between design deliverables and planning activities.<\/span><\/p>\n<h3><b>Examples of data-supported planning activities<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">With structured model data, teams can:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Extract material quantities directly from the model<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Generate early estimates with more confidence<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Evaluate design decisions based on accurate quantities<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Plan installation sequences using coordinated geometry<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Improve the reliability of construction schedules<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Support prefabrication workflows through accurate system modelling<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Because the data is tied to model elements, it remains consistent throughout design and construction. This consistency strengthens planning accuracy and supports smoother coordination between office and field teams.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">BIM\u2019s structured data contributes significantly to project transparency, helping teams maintain consistency across all stages of delivery.<\/span><\/p>\n<h2><b>Benefit 5: Lifecycle Information for Operations and Maintenance<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">One of the long-term benefits of BIM modeling is its ability to support facility management after construction. The final as-built BIM model can include equipment information, maintenance schedules, asset identification data, and operational requirements. This allows facility managers to trace key information quickly and maintain their assets efficiently.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Lifecycle-enabled BIM is becoming more valuable as organizations focus on long-term building performance. Having access to accurate digital models can improve planning for future renovations, system replacements, or operational upgrades.<\/span><\/p>\n<h3><b>Examples of lifecycle applications<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Facility management teams may use BIM data to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identify equipment locations within the building<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Review maintenance requirements linked to model elements<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Plan renovations using accurate as-built conditions<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Track asset performance across the lifecycle<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Analyse building operations to improve energy efficiency<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Prepare long-term capital plans based on reliable data<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">By extending BIM into operations, owners gain long-term value from the information created during design and construction. This contributes to a better understanding of how systems perform and what improvements may be required.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Lifecycle integration also promotes more sustainable building practices by helping organizations evaluate long-term maintenance strategies and performance-driven upgrades.<\/span><\/p>\n<h2><b>Benefits of BIM Across Project Phases<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Project Phase<\/b><\/td>\n<td><b>Core Benefit<\/b><\/td>\n<td><b>Impact Example<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Design<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Visualization and coordination<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Fewer spatial conflicts and improved decision-making<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Construction<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Risk reduction through early detection<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Lower rework and more predictable installations<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Operations<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Lifecycle data management<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Better maintenance planning and asset tracking<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">This table highlights how BIM benefits multiple stages of a project by improving clarity, coordination, and long-term performance.<\/span><\/p>\n<h2><b>Benefit 6: Interdisciplinary Collaboration and Workflow Integration<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Collaboration across architecture, engineering, and construction is central to BIM. Its structure encourages teams to work together within a unified digital environment. This reduces fragmentation and encourages consistent communication between disciplines.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Integrated workflows help manage interdependencies between systems, which is essential for modern buildings with sophisticated engineering requirements. BIM encourages teams to meet regularly, review model updates, and coordinate their work proactively.<\/span><\/p>\n<h3><b>Examples of integrated workflows supported by BIM<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Teams are better equipped to collaborate when they can:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Share model updates using a structured coordination environment<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Review combined models during scheduled design and coordination workshops<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Use visual tools to understand interactions between systems<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Track decisions through documented change logs<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintain consistency between model geometry and associated project data<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">A well-integrated workflow supports smoother transitions between design stages. It also ensures that each discipline works with accurate and up-to-date information. Over time, this strengthens trust between teams and contributes to higher-quality outcomes.<\/span><\/p>\n<h2><b>Benefit 7: Safety and Sustainability Advantages<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">BIM modeling supports safety planning and environmental performance analysis. Because the model contains structured and accurate geometry, teams can simulate construction activities or evaluate environmental factors at early stages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Safety and sustainability considerations are becoming increasingly important in Canadian construction. BIM helps teams address these priorities early and thoroughly.<\/span><\/p>\n<h3><b>Sustainability and safety applications<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Some examples include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Evaluating energy performance based on building geometry<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing egress paths and verifying safe movement within a building<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Assessing material choices for environmental impact<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Planning installation sequences to reduce safety risks<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Testing environmental conditions such as sunlight, shading, and airflow<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">By identifying issues early, teams promote safer working environments and better environmental performance throughout the building\u2019s lifecycle. Simulations help anticipate challenges that are difficult to detect using traditional documentation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This proactive approach supports more resilient design and helps ensure that construction activities proceed safely and efficiently.<\/span><\/p>\n<h2><b>Benefit 8: Improved Predictability and Project Control<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Predictability is essential in construction, and BIM supports it through coordinated information, structured modeling, and reliable communication channels. Teams can plan more effectively, assess impacts accurately, and make decisions based on clear information.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Predictability extends beyond design coordination. BIM strengthens project control by allowing teams to evaluate schedule impacts, anticipate construction challenges, and maintain a clear view of how design changes affect downstream work.<\/span><\/p>\n<h3><b>Examples of BIM-Enabled Predictability<\/b><\/h3>\n<table>\n<tbody>\n<tr>\n<td><b>Area of Predictability<\/b><\/td>\n<td><b>Support Provided by BIM<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Schedule planning<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Clear sequences based on coordinated models<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Field accuracy<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Improved alignment between virtual design and site conditions<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Decision-making<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Reliable, model-driven insights<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Change management<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Clear tracking of updates and their implications<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Predictability helps reduce uncertainty and allows teams to maintain steady progress. Having access to up-to-date model information strengthens decision-making and reduces delays.<\/span><\/p>\n<h2><b>Why BIM\u2019s Benefits Matter for Project Delivery<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The benefits of BIM modeling have a direct impact on how projects are delivered. By improving coordination, enhancing visualization, and supporting early detection of conflicts, BIM contributes to better project outcomes and more reliable construction workflows. These advantages extend throughout the asset\u2019s lifecycle, strengthening facility operations and supporting long-term performance goals.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Organizations seeking structured and consistent BIM workflows benefit from well-defined processes, reliable model standards, and coordinated data environments. DBABIM supports clients in implementing BIM practices that align with project needs while maintaining clarity and consistency across all stages of the workflow.<\/span><\/p>\n<h2><b>Conclusion<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The benefits of BIM modeling are wide-ranging, supporting improved coordination, greater accuracy, safer construction, and more efficient long-term operations. By transforming how information is created, shared, and managed, BIM helps organizations deliver projects with greater confidence and better outcomes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As digital workflows continue to evolve, BIM will remain a central tool for enhancing project performance and creating buildings that meet both current and future needs. Teams that understand its benefits and structure their processes accordingly are well positioned to achieve reliable and sustainable results.<\/span><\/p>",
        "protected": false
    },
    "excerpt": {
        "rendered": "<p>Building Information Modeling (BIM) improves coordination, reduces construction risks, enhances visualization, and supports long-term asset management. This article explains how BIM modeling adds value across design, construction, and operations.<\/p>",
        "protected": false
    },
    "author": 4,
    "featured_media": 7386,
    "comment_status": "open",
    "ping_status": "closed",
    "sticky": false,
    "template": "",
    "format": "standard",
    "meta": {
        "_acf_changed": false,
        "_seopress_robots_primary_cat": "none",
        "_seopress_titles_title": "Benefits of BIM Modeling in Modern Construction Projects",
        "_seopress_titles_desc": "Discover the key benefits of BIM modeling, including improved coordination, early clash detection, better visualization, and lifecycle asset management.",
        "_seopress_robots_index": "",
        "footnotes": ""
    },
    "categories": [
        8
    ],
    "tags": [],
    "class_list": [
        "post-7383",
        "post",
        "type-post",
        "status-publish",
        "format-standard",
        "has-post-thumbnail",
        "hentry",
        "category-bim"
    ],
    "acf": [],
    "_links": {
        "self": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/7383",
                "targetHints": {
                    "allow": [
                        "GET"
                    ]
                }
            }
        ],
        "collection": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts"
            }
        ],
        "about": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/types\/post"
            }
        ],
        "author": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/users\/4"
            }
        ],
        "replies": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/comments?post=7383"
            }
        ],
        "version-history": [
            {
                "count": 4,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/7383\/revisions"
            }
        ],
        "predecessor-version": [
            {
                "id": 8036,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/posts\/7383\/revisions\/8036"
            }
        ],
        "wp:featuredmedia": [
            {
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media\/7386"
            }
        ],
        "wp:attachment": [
            {
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/media?parent=7383"
            }
        ],
        "wp:term": [
            {
                "taxonomy": "category",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/categories?post=7383"
            },
            {
                "taxonomy": "post_tag",
                "embeddable": true,
                "href": "https:\/\/dbabim.dba-qc.com\/en\/wp-json\/wp\/v2\/tags?post=7383"
            }
        ],
        "curies": [
            {
                "name": "wp",
                "href": "https:\/\/api.w.org\/{rel}",
                "templated": true
            }
        ]
    }
}